TECHNICAL CONSTRUCTION

WHITEMAN PARK FIREMAIN UPGRADE

Client: Building Management and Works  

Architect: Hodge Collard Preston Architects

Site works and installation of two 148KL storage tanks and state of the art pumping system including backup systems. The project included the new build of the pump house, installation of perimeter hydrants and piping spanning 2km.

KITCHEN: BRIGHTWATER SOUTH LAKES

Client: Brightwater Care Group     

Architect: Scott Penn Hall Architects

Complete demolition and installation of a commercial kitchen including: Commercial appliances, stainless steel prep areas, and commercial cooking and exhaust systems.  The project was completed within a high risk site, around a fully operational aged care facility.

CIT LEEDERVILLE FIREMAIN UPGRADE

Client: Central Institute of Technology     

Design: Norman Disney Young

New pump room including the installation of pump system, Large tanks and associated pipe work. The publication also shows the commissioning of the pumps.

KALAMUNDA SHS: SCIENCE  LABORATORY

Client: Building Management and Works  

Architect: Site Architecture
The new science laboratory at Kalamunda Senior High School has provided the school with a multifunctional learning facility for students. 

BUS TRANSFER STATION: THE CAUSEWAY

Client: Public Transport Authority   

Removal and replacement of approx. 550sqm of glazing including manufacture and installation of new structural glazing framework. Competed the project ahead of time and exceeding the clients’ expectations of quality and without disruption to the public.

TRANSFORMER STATION: KWINANA

Client: Sims Metal Management  

Architect: ADC Projects

The project included all technical elements as required by Western Power.  Construction of the pit, includig 2T pulling eyes all ready for the transformer installation. Concealing this pit was the construction of a fire rated structure.

© 2019 BE Projects (WA) Pty Ltd